Kiroseiz City - El Syiouf
CFA Foundation Piles
Client: Kiroseiz contracting & Development
Scope of work: over 2000 piles -60cm - 20
Construction period: 8 month

SEIF Buildings- at Smouha & Side Bisher
CFA Retaining wall and Foundation Piles
Client: Seif for construction co.
Scope of work: about 600 cfa foundation piles
and secant (bentoniet)
Construction period: 1.5 month each building

Alexandria Regional control Towers
Simiens
Client: Taradco - Semines
Scope of work: cfa piles for 4 tower- 18 m long
Construction period: 1.5 month

Abokir For Fertilizers co.-Housing
Vibro Piles 19 m long.
Client: Abokir for Fertilizers
Scope of work: over 2000 piles
Construction period: 11 month

Meamy Buildings
Dewatering system for 7000 m2
Client: Eng nabil meshraa
Scope of work: Dewatering system for 7000m2
Construction period: 12 month

Businessmen (2)
Secant pile Retaining wall & CFA piles
Client: Tarik El Sayad
Main Contractor: Arab contractors
Scope of work: over 2000 Secant piles
& over 4000 CFA Piles
Construction period: about 9 month ( 1999-2000)

Damanhour Stadium
Capacity: 30,000
Client: Governorate: Behira
Scope of work:  
Construction period: Under construction

Borg El Arab stadium Capacity: 80,000

Client: Governorate: Alexandria
Scope of work:  
Construction period: Under construction